
Official MCP RegistryListed
Entogo power-equipment knowledge & tools
Entogo (Canada) transformers, switchgear, BESS, EV charging: catalogue, lead times, EV sizing, RFQ
First seen 2 Oct 2026. Evidence as of 7 Oct 2026.
7
Tools
From an anonymous probe
1
Source listings
Each with its own history
2
Recorded changes
Since first seen
Tools
| Tool | Description | Behaviour |
|---|---|---|
| estimate_ev_charging_capacity | Runs the same engine as https://entogo.ca/tools/ev-charging-service-capacity-calculator/: code load (NEC 2023 / NEC 2026 / CEC 2024 Section 86) for a set of Level 2 and DC fast chargers, EMS-managed load when an energy management system is declared, planning-basis load with site diversity, recommended transformer kVA and service / switchboard rating, and a GREEN / YELLOW / RED verdict against an existing service when one is given. Planning estimate only. | Read-only |
| get_company_facts | Verified company facts: legal name, founding, headquarters, contacts and office hours, factory and capacity narrative, lead-time and warranty commitments, certifications, standards position, quote channel and key URLs. | Read-only |
| get_lead_time | Delivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 16–24, large engineered-to-order systems 16–24 weeks; new cULus / CSA certification can extend a band, to within 36 weeks when the order needs it. IEC/CE equipment built for export markets: about 12 weeks. | Read-only |
| get_product | Full record for one product by catalogue id (slug): specifications, features, applications, FAQs, certifications listed on the page, lead-time band, language editions, Markdown twin and the quote channel. | Read-only |
| list_products | List products in the catalogue, optionally filtered by category (power = transformers & substations; distribution = switchgear & distribution; storage = battery energy storage; emobility = EV charging & PV-storage-charging) and/or a keyword. Returns compact rows; call get_product for full specifications. | Read-only |
| request_quote_handoff | Returns the right channel for a request for quotation (RFQ): the transformer configurator deep link (pre-filled with the product name), the contact page, e-mail and phone numbers, office hours and the one-business-day response commitment. This tool stores nothing and sends nothing — the user completes the request on entogo.ca or by e-mail. | Read-only |
| search_knowledge | Semantic search over Entogo's product, solution, manufacturing, certification, lead-time and warranty knowledge (the same index that grounds the Ensight assistant). Returns the best-matching passages with source URLs. | Read-only |
Change history
- get_lead_time: description changed (+"16–24," +"cULus" +"band, to")
- server instructions changed (+"16–24-week" +"for North-American-spec (ANSI/IEEE) builds (within 36" +"when the order needs")
| Source | Listing | First seen | Last seen | Versions |
|---|---|---|---|---|
| Official MCP Registry | ca.entogo/knowledge | 2 Oct 2026 | 7 Oct 2026 | 1 |