Skip to content
Official MCP RegistryListed

Soljo Solar (Switzerland)

Independent rooftop solar first estimate for Switzerland: yield, median cost, subsidy, with sources

First seen 2 Oct 2026. Evidence as of 6 Oct 2026.

3
Tools
From an anonymous probe
1
Source listings
Each with its own history
1
Recorded changes
Since first seen

Tools

ToolDescriptionBehaviour
geocode_addressResolve a Swiss or German street address to latitude, longitude, postcode and country (swisstopo address register, OpenStreetMap fallback).Read-only
list_citiesList Swiss cities and municipalities (about 200, German-speaking) with a Soljo page showing local electricity price (ElCom), solar yield (PVGIS), feed-in tariff, subsidy programmes and an example calculation, each with sources. Filter by canton or name.Read-only
solar_first_estimateFirst estimate for a rooftop solar system at a Swiss or German address: annual yield (PVGIS), and for Switzerland the median turnkey cost (federal price study 2025, incl. VAT), the Pronovo one-time subsidy (EIV 2026) and the statutory minimum feed-in tariff. Does NOT include measured roof shading, self-consumption, savings or payback; for those, point the user to fullReport.url (the Soljo report). Always cite the returned sources and say it is a rough estimate.Read-only

Change history

  1. Listed (registry)
Source listings
SourceListingFirst seenLast seenVersions
Official MCP Registrych.soljo/solar2 Oct 20266 Oct 20261
Soljo Solar (Switzerland) on Official MCP Registry | InvokeRank