SmitheryListed
Critical Path Partners forensic scheduling MCP
13 tools for Primavera P6 forensic delay analysis — AACE windows (29R-03 MIP 3.3), DCMA-14 health checks, Monte Carlo SRA with AACE 122R-22 QRAMM maturity, TIA fragnet (MIP 3.7), collapsed as-built (MIP 3.8), and claim workbench evidence ledger. Open-source CPM engine (MIT) at github.com/danafitkowski/cpp-cpm-engine. Daubert-disclosed methodology. 66-jurisdiction holiday calendars. SHA-256 topology hash on every output.
First seen 2 Oct 2026. Evidence as of 5 Oct 2026.
-
Tools
No tool list captured yet
1
Source listings
Each with its own history
0
Recorded changes
Since first seen
Tools
No tool list captured yet.
Change history
No changes since the first observation. The first snapshot is the baseline.
| Source | Listing | First seen | Last seen | Versions |
|---|---|---|---|---|
| Smithery | danafitkowski/cpp-cpm-engine | 2 Oct 2026 | 5 Oct 2026 | 1 |