Project management methodology graph: route planning, stage-gate decisions and plan checks.
Listed on
First seen 3 Oct 2026. One server, whatever directories list it: each directory listing keeps its own page and history.
1
Directories
Collected by InvokeRank
8
Tools
From an anonymous probe
-
ToolBench grade
Not graded by Arcade
-
GitHub stars
No repository data
Tools
| Tool | Description | Behaviour |
|---|---|---|
| check_gate | Evaluates gate g.g0 … g.g10 against your evidence. Outcome precedence: Stop > Recycle > Hold > Conditional go > Go, with the rule that fired (outcome_reason). Critical evidence missing or stale → Hold; required non-critical missing, or a waiver without a reason or an approver who decides at this gate → Conditional go; a waiver with both → Go with the Waiver modifier (under regulation a waived critical artifact stays Conditional go until the deviation is recorded with the quality approval); optional gaps are notes. Modifiers: Work started without the gate, Overdue, Stale, Waiver. gate.deciders decide, gate.advisors take part. A disproved key product hypothesis is a Recycle, not a Stop: pass earlier_stage_invalid:true with invalid_stage:'st.discovery'. At G8 (go / no-go), work_started_beyond:true means production was changed before the decision: Hold (R3), not a Go with a modifier. Call without evidence to list what the gate needs. Returns a receipt hash of the inputs. | Read-only |
| check_mix | For a set of ids: antipatterns in the set and detected by rules, conflicts, redundant alternatives (e.g. seven estimation methods), items to avoid or not applicable here, risks, missing inputs and suggested additions. ok = no antipatterns, conflicts, avoid or not-applicable items; a detected pattern of severity warning (e.g. output over outcome on a client contract) does not change ok. | Read-only |
| explain_node | One node with its description, conditions, source, level and its links grouped by type, each with a link id (Lxxxx) to cite. Filter with link_types, direction and limit. | Read-only |
| list_context | Call first. Returns the context dimensions and flags (with defaults and how many rules each flag drives), stages, gates, evidence states and levels, the gate outcome precedence and the suggested workflow. | Read-only |
| plan_project | Route from presale to closure for a project context. Default is compact (ids by strength + a names dictionary, core items and gate evidence for all stages, about 6–10k characters). Ask for one stage with stages:['st.design'] and format:'full' for reasons, avoid texts and gate details. 'core' = do it here (context rule, flag or gate-critical artifact), at most 8 work items per stage (producers of the gate's critical artifacts first, then context rules, then flags). | Read-only |
| search_graph | Search names, ids, descriptions and aliases in English and Russian (word stems, small typos tolerated). Returns total and the best matches. | Read-only |
| validate_plan | Checks an ordered list of steps (stages, gates, events, practices, techniques, notations, artifacts). Errors: empty plan, unknown ids, non-step types, stage order (analysis and design work planned early is only a warning 'early'; building before G3–G5 is an order error), contract after delivery gates, a gate after the step it authorises (G8 after the cutover), antipatterns, avoid or not-applicable items. Warnings: duplicates, redundant alternatives, early work, a cutover with no G8 or go / no-go meeting before it, antipatterns of severity warning. 'Shadow start' looks at the order: G4 or G5 must come before the first build step. 'expected' lists gate evidence not yet produced by earlier steps. | Read-only |
| when_to_use | For one event, practice, technique, notation, tool, artifact or antipattern: does it fit this context (fits / avoid / not_applicable / antipattern), its strength and why, alternatives and their group advice, risks, and which gates require it. | Read-only |